Vittoria Rd Roundabout, Bunbury – Field Monitoring of Dewatering Works for ATCO Gas Pipeline Relocation
- Dewatering discharge pond excavated and lined
- Dewatering discharge dispersed using perforated pipe outlet
- Dewatering spears at excavation site
- Gas pipe excavation possible due to dewatering works
Lake Preston Rehabilitation – Part of the Management of a Conservation Covenant
Seedlings were coming up well following good rains last winter and recent summer rains
Providing Groundwater Management Advice for a Number of Basic Raw Material Sites for Main Roads WA
- Drilling investigations for Main Roads WA projects
- Drilling investigations for Main Roads WA projects
- Surveyor from Harley Dykstra surveying wetland water level measuring gauges at the Hyder Road Pit
Observing, Describing and Sampling Soil Profiles
- Observing, describing and sampling soil profiles
Undertaking Noise Measurements for Modelling of Noise for Noise Management Plans
- Measuring noise levels from a Front-end Loader
- Undertaking noise measurements from a Rock Breaker mounted on an Excavator
- Measuring noise levels from a Crusher
- Measuring noise levels from a moving Bulldozer
Stormwater Detention Ponds at Donningtons Gravel Quarry in the Shire of Chittering
- Stormwater detention ponds after a significant rainfall event
- Stormwater detention ponds after a significant rainfall event
Environmental Audit of Hydrocarbon Contamination near Ambergate
- Sampling of the Fuel Tanks Storage Area
- Sampling of the previous Fire pit Area
- Trenches for Kiln Area Sampling
- Microbial accelerant being applied to landfarm area on impervious liner
Planting of a Native Tree Belt for Visual Screening in Donningtons
July 2016
September 2017
- Plants well established after one year
July 2021
- Trees average 5m high after five years
Field Testing for Acid Sulfate Soils Survey at Donningtons
Soil Profiling for Groundwater Management Planning in Ludlow